The chip are out of stock and will hit again in 2018

Author: Queena
Source:
Date: 2017-11-27

Because of automobile electronic, Internet and other new demand emerge, 2017 parts of semiconductor production chain appear out of stock situation, not only the upstream materials such as silicon wafer and wire frame out of stock, including DRAM and NAND Flash, NOR Flash synchronization also out of stock, the other microcontrollers, gold effect transistors are also due to the shortage of oxygen half spin conveniently rise in price, delivery or imbalance between supply and demand of rare.

The upcoming 2018, silicon chip and the wire frame is still in short supply, prices will continue to increase, DRAM, MOSFET shortage situation difficult to relieve, MCU although delivery time could be shortened due to enter the off-season, but in general delivery for three months, still higher than normal safety stock period 1 ~ 1.5 months. As for NAND/NOR Flash, the shortage pressure will be alleviated due to the new capacity.

In semiconductor silicon chip, because the main supplier no expansion in recent years, this year I met semiconductor wafer production capacity for prescribing, in 2017, the year is out of stock, will be in short supply in 2018; In order to ensure the availability of silicon wafers in 2018, the global semiconductor manufacturing plant prepaid a deposit to ensure that the price of the goods will be raised next year. The company is optimistic about the operation of silicon wafer suppliers such as ring spherocrystal, syncrystal, jijing and taisheng co.

Semiconductor wire frames also face a shortage of goods. Because international IDM factory to those auto electronics and Internet market, increased demand for wire rack, but the main suppliers for the whole and in recent years, in the second half of this year the supply is tight, in the first half of next year will also be slightly out of stock, the price is expected to rise further, long for huake, bounded lam suppliers.

DRAM memory shortage is serious, the second half of the first half of next year will continue to be out of stock, although the industry to increase production capacity, but the new capacity will fall out time after the end of next year and early this year, so in the first half of 2018 DRAM bit supply growth can only rely on 1 x nanometers upgrade, the whole is in short supply, prices continue bullish, South Asia, winbond electricity and adata, will continue to benefit from.

In the first half of next year, there will be a relief for NAND Flash and NOR Flash. In the second half of the year, including samsung, Toshiba, SK hynix and micron, the 3D NAND production capacity and technology conversion have been accelerated. The yield has been continuously improved, and the production capacity will be plentiful after next year's production capacity. Mainland NOR Flash also for Yangtze river and smic storage capacity, combined with crystal into OEM market, in the first half of next year capacity increase, demand side into the traditional off-season, the market is expected to be balance between supply and demand.

As for MCU in the market, because the car electronics and the Internet of things in MCU architecture, but including meaning, ti, renesas IDM factory production capacity is insufficient to meet demand, resulting in delivery spin to more than 3 months, part of the shortage of serious material delivery more for up to six months. As the end demand in the first half of next year to enter the off-season, the wafer foundry production support, delivery is expected to shrink to within three months, but it is still a safe delivery of 1 ~ 1.5 months long, holtek, new tang the benefit transfer documents, operating in the first half of next year will be off-season does not light.

International IDM factory gradually fade out of low-voltage MOSFET in computers and consumer electronics market, transfer to high voltage MOSFET in automotive electronic market capacity, or shift production insulated gate bipolar transistor (IGBT) or Super Junction (Super Junction) components, so in the low pressure is a serious shortage of MOSFET in the second half of the year, because there was no new capacity to support during the first half of next year, will remain in short supply situation, but the shortage of gap will be narrowed, legal person watch the Nixon, large and medium-sized, fuding operational performance.


Related recommendation / 热点新闻
2018 - 02 - 06
点击次数: 0
Joinwin will participate in the spring of 2018 consumer electronics as show exhibitors, which is held by global sources . The exhibition time of the consumer electronics exhibition will be o...
2017 - 11 - 22
点击次数: 461262
H61-2ndCPU1. Supports 3rd Gen(IVY Brige). Intel® 22nm CPUs and 2nd Gen(Sandy Bridge). Intel® Core™ CPUs (LGA1155)Chipset1. Intel® H61 Express ChipsetMemory1. Supports DDR3 1600/...
2017 - 11 - 07
点击次数: 0
2017 New Arrival mining Motherboard H110 lga1151 price :$44.1/pcsProduct DescriptionCPUSupports 6/7rd Gen(lvy Bridge). Intel® Core™ CPUs (LGA1151)ChipsetIntel® H110 Express ChipsetMemorySupp...
2017 - 11 - 06
点击次数: 0
Special offer, ddr2 ddr3 ram promotion:Original chips PC DDR2 800 2GB 16C-FULL COMPATIBLE-$4.6 MOQ1000pcsOriginal chips PC DDR3 1333 4GB 16C-FULL COMPATIBLE-$24.3 MOQ500pcsEnjoy lifetime warranty,10...
2017 - 10 - 24
点击次数: 0
World famous e-sports peripherals overclocking memory and high-end leading brand, G.Skill, international published Ripjaws DDR4 SO - DIMM series new four-channel suit DDR4-3800 MHZ 32 gb (4 x8gb), ev...
2017 - 10 - 20
点击次数: 0
8gb ddr4 ram mini computer memory card promotion price:$89.60/pcsGolden memory ram all enjoy lifetime warranty,100% tested before delivery,Support Customized Logo,Retail Packing or Bulk Packing,ETT Or...
2017 - 08 - 09
点击次数: 0
Although Intel is not specialized in manufacturing the SSD, but its strength is very strong, in the enterprise market and Intel is very active, rich products, technology is also constantly breakthroug...
2017 - 10 - 13
点击次数: 0
2017 NEW GM sata3 2.5inch SSD 60GB promotion price: $29.5/pcsBased SpecificationControl chipSM2246ENInterfaceSATAIIICapacity60GBCache128MBFlash typeMLC NAND FlashRead/Write PerformanceSequential Read4...
2017 - 08 - 04
点击次数: 0
Toshiba 64 layers of stacked 3 d flash technology is practical, rapidly following the mainstream XG5 NVMe, low-end TR200 SATA, Toshiba and released the SSD, based on the new flash memory in the third ...
2017 - 07 - 20
点击次数: 0
4G 2133 REG ECC DDR4 SERVER RAM 22.00 8G 2133 REG ECC DDR4 SERVER RAM 84.50 16G 2133 REG ECC DDR4 SERVER RAM 158.30 32G 2133 REG ECC DDR4 SERVER RAM 289.00 32G 2133 REG ECC DDR4 SERVER RAM 305.50
Contact Us
  • joinwin1
  • jw@pcjoinwin.com
  • +8613632905958
  • Room 906, 9/F Bantian Group commerical center, No. 20. LiShipai. Longgang district, Shenzhen. 

 







Copyright © 2013-2014 JOINWIN INDUSTRIAL DEVELOPMENT LIMITED. All Rights Reserved
犀牛云提供企业云服务